☐ Clash detection across architectural, structural, electrical, fire alarm, fire fighting, plumbing, and HVAC drawings
☐ Reviewing and submitting shop drawings
☐ Reviewing and submitting material submittals
☐ Raising RFIs (Requests for Inspection)
☐ Raising technical queries to the consultant
☐ Taking material approvals from the client and consultant
Example: on the EBARA Pumps Expansion (Dammam, Saudi Arabia), this category was the core of day-to-day work — coordinating civil, mechanical, and electrical scopes in a dense industrial layout.
☐ Maintaining progress as per the approved schedule
☐ Preparation and updating of the resource plan on a quarterly basis
☐ Preparation of Method Statements and Bar Bending Schedule
☐ Estimation of quantities
☐ Preparation and tracking of long lead items
Example: on Executive Lodges G+10 (Pakistan), resource planning and Bar Bending Schedule preparation were central to keeping a high-rise structural program on track.
☐ Subcontractor management
☐ Material selection within budget range and approved quality standards
☐ Raising material procurement requests, reviewing proposals technically and commercially, and preparing comparison sheets for vendor selection
☐ Raising subcontract requests (with/without material), reviewing proposals technically and commercially, and preparing comparison sheets for subcontractor finalization
Example: on the Residential Villas project (Edify Studio, Pakistan), subcontractor coordination across multiple villa units required constant vendor comparison and scope management.
☐ Preparation of monthly invoices for submission to the consultant
☐ Preparation of variation orders for client/consultant approval
☐ Assisting the Business Development Manager with costing and BOQ preparation
☐ Petty cash management at site
☐ Maintaining the concrete log
☐ Maintaining full project documentation — technical queries, material submittals, shop drawings, inspection requests, and concrete log
☐ Maintaining daily activity photos with proper records
☐ Preparation and submission of Daily Progress Reports
☐ Preparation and presentation of internal weekly reports
☐ Preparation and presentation of weekly progress reports to client and consultants
☐ Preparation and submission of monthly reports to MODON
☐ Preparation and maintenance of Minutes of Meetings records
☐ Maintaining strong working relationships with the client and consultant
☐ Ensuring proper coordination between all teams, client, and consultant
Example: MODON reporting applies specifically to industrial projects like EBARA Pumps Expansion, where monthly submissions follow the authority’s own documentation standards.
☐ Ensuring site safety per standards, with a zero-injury goal
☐ Workforce management
☐ Timesheets management
☐ Resolving team-level issues and escalating concerns to upper management
A quick reference for how emphasis shifts depending on the type of project:
Project Type | Heaviest Responsibility Areas |
Industrial (e.g. EBARA Pumps Expansion) | Clash detection, long lead item tracking, MODON reporting |
Commercial (e.g. Sagheer Avenue G+6) | RFIs, shop drawing review, subcontractor coordination |
Residential (e.g. Residential Villas) | Material selection, vendor comparison sheets, workforce management |
High-Rise (e.g. Executive Lodges G+10) | Bar bending schedules, resource planning, safety management |
Is this checklist the same on every construction project?
The core categories stay consistent, but emphasis shifts by project type — an industrial project leans heavily on clash detection and long lead items, while a residential project leans more on subcontractor and material management (see the table above).
What’s the difference between this checklist and a Site Engineer’s responsibilities?
A Site Engineer’s list would be narrower — focused mainly on day-to-day field supervision. A Project Engineer’s checklist covers planning, procurement, documentation, and reporting in addition to site-level work. See the full comparison in Project Engineer vs. Site Engineer.
Do all Project Engineers handle cost-related tasks like BOQ and variation orders?
It varies by company and project size, but on mid-to-large projects, Project Engineers are frequently involved in BOQ support, variation orders, and invoicing — as reflected in the Cost, Documentation & Reporting section above.
Aown Muhammad is a Project Engineer based in Dammam, Saudi Arabia, registered with the Saudi Council of Engineers (SCE) and the Pakistan Engineering Council (PEC), with 7+ years of experience across residential, commercial, and industrial construction projects in Saudi Arabia and Pakistan. View full portfolio and projects →